Now accepting orders · Pan-India delivery
— Viraj Infra Prefab LLP · Est. India

Build Faster.Build Smarter.Build Prefab.

Premium prefab infrastructure — engineered in our factory, delivered to your site, assembled in weeks. Not months.

50% faster deployment90% less waste20+ year lifespan
WhatsApp Us
Years Experience
10+ Years
Projects Delivered
100+ Sites
Pan-India Reach
Maharashtra HQ
Scroll
FIG. 01 — Steel Frame / PEBSteel-frame factory unit
01
0%
Faster than traditional construction
02
0%
Less construction waste generated
03
0+
Years structural lifespan
04
0+
Projects delivered across India
— 03 / Catalogue

Our Complete
Product Range

From security cabins to multi-floor staff hostels — every unit is engineered, fabricated and finished to your exact specifications. Browse the lineup, then send us a brief.

PEB Structure
01

PEB Structure

Steel-span structures for warehouses, factories & industrial sheds. Large span, no interior columns, 20–30 year life.

20–30 YR LIFE
Site Office Cabins
02

Site Office Cabins

Executive project offices for construction sites. Steel frame + PUF panels, plug-and-play electrical.

PLUG & PLAY
Security Cabins
03

Security Cabins

Compact 4×4 to 4×6 ft cabins for gates, societies & factories. Glass windows for full visibility.

4×4–4×6 FT
Modular Prefab Buildings
04

Modular Prefab Buildings

Multi-storey expandable modules for offices, schools & hospitals. Assembled on-site like building blocks.

MULTI-STOREY
Prefab Residential Houses
05

Prefab Residential Houses

LGSF / PUF panel homes built faster than traditional construction. Energy efficient, modern design.

LGSF · PUF
Industrial Prefab Structures
06

Industrial Prefab Structures

Heavy-duty structures for manufacturing units & plants. High load capacity, custom design.

HEAVY DUTY
Prefab Institutional Buildings
07

Prefab Institutional Buildings

Schools, hospitals & offices for government and NGO projects. Fast setup, hygienic design.

GOVT · NGO
Premium Luxury Portable Cabin
08

Premium Luxury Portable Cabin

Resort-grade interiors with wooden finish, glass elevation, AC & furniture.

PREMIUM
Cold Storage & Specialized
09

Cold Storage & Specialized

PUF insulated temperature-controlled structures for pharma & food storage.

PUF INSULATED
Portable Toilets
10

Portable Toilets

Self-contained sanitation with WC, wash basin & plumbing. Single or multi-unit.

SELF-CONTAINED

Need a custom solution?

Tell us your site dimensions, intended use, and timeline. We'll engineer it.

— 04 / The Comparison

Why Prefab Wins
Every Time

The math is simple: a controlled factory environment produces faster, cleaner and more predictable results than open-air, on-site construction.

Traditional Construction

The Old Way

  • ~12 months delivery on average
  • Weather, monsoon & site delays
  • 40% more material wastage
  • Fixed layout — costly to modify
Viraj Prefab

The Modern Way

  • ~6 months end-to-end delivery
  • Factory-controlled, weather-proof
  • 90% less site waste
  • Modular & relocatable units
50%

Faster deployment, full stop.

By shifting construction into a controlled factory environment, we eliminate weather delays, on-site congestion and rework — delivering significant cost and time savings on every project.

— 05 / Three Pillars

The Prefab
Advantage

Three reasons builders, developers and government bodies are switching from traditional construction to prefab — for good.

01

Rapid Speed

Concurrent off-site manufacturing and on-site groundwork compresses timelines and cuts delivery time by 50%.

02

Total Flexibility

Expand, reconfigure or fully relocate your structure as your site requirements change over time.

03

Eco-Friendly

Generates up to 90% less waste than traditional methods — material reused, recycled, or never created.

— 06 / Engineering

Built to Engineering
Standards

Every Viraj structure is engineered for the climate, the load, and the lifespan it has to deliver. Compliant by design — IS-2062 sections, certified panels, plug-and-play services.

Earthquake Resistant

Engineered to withstand seismic activity — designed for the safety of every occupant inside.

Thermal Insulation

High-density sandwich panels maintain comfortable interior temperatures even in extreme climates.

Fire Retardant

Materials selected for fire safety and full industrial compliance — tested, certified, dependable.

Plug-and-Play

Ready-to-use electrical, plumbing and HVAC fixtures integrated at the factory — power up day one.

Prefab Institutional Building - 5 storey prefab facade
FIG. 06 — INSTITUTIONAL
5-storey prefab façade
IS-2062 ✓
— 07 / The Process

From Concept to Handover
in 4 Steps

One project lead. Four well-defined phases. Total visibility from the day you call us to the day you cut the ribbon.

01
Week 1

Consultation

Requirement gathering, site visit and feasibility assessment by our project lead.

02
Week 2–4

Design

3D modelling, floor plan iteration and engineering drawings approved by you.

03
Week 4–10

Production

Off-site factory manufacturing with rigorous quality control at every stage.

04
Week 10–12

Assembly

Rapid on-site installation, final fit-out, snagging and handover.

Ready to start?

Free consultation. Quote within 24 hours. Project kickoff within a week.

— 08 / Case Files

Projects We've
Delivered

Trusted by international schools, fashion brands, real-estate developers and government bodies. A small selection of recent work below.

Sales Office
Prefab Sales Office

Prefab Sales Office

Rever Dale · Karadi, Pune
School
Prefab School Building

Prefab School Building

Bombay Scottish School · Mumbai
Staff Quarters
Prefab Staff Quarters

Prefab Staff Quarters

Arvind Fashions Ltd. · Ahmedabad
Transit Camp
Prefab Transit Camp

Prefab Transit Camp

Chembur · Mumbai

Ready to add your project to this list?

Quote in 24 hours · Site visit included · Pan-India delivery

— 09 / Specifications

Technical
Specifications

Standard configurations are detailed below. Every parameter is tunable on request — from panel thickness to floor finish to structural grade.

SpecificationStandard Labour CampSpecial Purpose Buildings
Wall Thickness50mm PUF / EPS Panel80–100mm Insulated Panel
StructureCold / Hot Rolled Steel SectionsHigh-Grade IS-2062 MS Sections
FlooringCement Fiber Board + VinylHeavy-Duty MS Checkered Plate
Expected Life20+ Years25+ Years
Request Detailed Specification Sheet— PDF · Sent within 1 working day
— 10 / Partnerships & Society Work

Two Ways
to Work With Us

Take Viraj Prefab to your city as a dealer, or commission us directly for residential and society fabrication projects. Both teams reply same-day.

Viraj Prefab dealership - PUF panel material
— Channel Partnership

Become a Viraj
Prefab Dealer

Bring modern prefab to your region. Low investment, exclusive territory, full technical and sales training.

  • Low investment
  • High market demand
  • Full training provided
  • Exclusive territory
Society parking shed - prefab fabrication
— Residential & Society

Society & Residential
Projects

Custom steel and prefab fabrication for housing societies — from car parks to main gates.

  • Parking sheds
  • Terrace sheds
  • Staircase railings
  • Main gates
  • Safety grills
— 11 / Get Started Today

Build Your Structure
in Half the Time.

Get a free consultation and quote within 24 hours. No obligations. Pan-India delivery.

Call: +91 9005289393Email Us
Chat with us · Reply in mins